Quote

From:

110 Augusta Arbor Way
Greenville, SC 29605

Sales@Clearballistics.com

Quote Number QUO-54600
Quote Date May 15, 2018
Total $44,085.72
To:
US Air Force

This Quote is for Head, torso, limbs.

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Molding Fee for the Right Leg

This is a onetime fee to make the mold of the right leg. lead time is 4 weeks

$2,436.980%$2,436.98
1 Molding Fee for the Left Leg

This is a onetime fee to make the mold of the left leg. lead time is 4 weeks

$2,439.980%$2,439.98
1 Molding Fee for the Left arm

This is a onetime fee to make the mold of the left arm. lead time is 4 weeks

$2,339.980%$2,339.98
1 Molding Fee for the right arm

This is a onetime fee to make the mold of the right arm, leadtime is 4 weeks

$2,339.980%$2,339.98
16 10% Ballistics Gel Right Leg

We will use 10% ballistics gel to make each right leg

$425.480%$6,807.68
16 10% Ballistics Gel left Leg

We will use 10% ballistics gel to make each left leg

$425.480%$6,807.68
16 10% Ballistics Gel Right Arm

We will use 10% ballistics gel to make each rigt Arm

$305.360%$4,885.76
16 10% Ballistics Gel Right Arm

We will use 10% ballistics gel to make each Left Arm

$305.360%$4,885.76
16 10% Ballistic Head and Torso (connected)

The Upper torso and head will need to be connected. 10% Gel will be used for both the head and torso.

$696.370%$11,141.92
1 FedEx Freight Shipping

Becouse of the size the torso and head will have to be shipped via fright. once we have your address we can quote this out.

$0.000.00%$0.00
Sub Total $44,085.72
Tax $0.00
Total $44,085.72

Add a comment

Your email address will not be published. Required fields are marked *